Technology subrack
Hardware - SIMADYN D
7-9
Edition 03.2001
7
7.2.6 Synchronizing possibilities
The T400 offers various ways to process and transfer synchronizing signals.
The processing possibilities are listed in the following diagram. The three
selector switches indicated, are set by appropriate configuring.
T0GATE
Port A/4
Com board
X2 / A26
Base board
X1 / A26
L_INT_DPR_PT
Port A/5
L_INT_DPR_CU
L_INT_CU_DPR
Com board
X2 / B25
Base board
X1 / B25
L_INT_PT_DPR
T0OUT
SYNC_COM
SYNC_BASE
Inputs
Outputs
Steer
Processor
Fig. 7-4 Synchronizing possibilities
The
basic cycle
of the T400 can be taken from three various sources (can
be configured in HWConfig):
•
Basic cycle time of the T400 (standard)
•
Synchronizing signal of the BASE BOARDs (L_INT_CU_DPR (connector
X1/B25) for T0GATE)
•
Synchronizing signal of the COM BOARDs (L_INT_DPR_PT (connector
X2/A26) for T0GATE)
Thus, a cycle from the CBX can synchronize the T400 and BASE BOARD
(CU).
Configurable
interrupt tasks
can also be called using the synchronizing
signals from BASE- or COM BOARDs (ports A/4, A/5).
The T400 can supply BASE- and COM BOARD synchronizing signals, which
come from the following three sources and can be selected by appropriately
configuring:
•
Basic cycle time of the T400 (T0OUT of MFB1)
•
Directly connecting synchronizing signals from the BASE- or COM
BOARD to the other module
•
In an FP with a special FB-generated synchronizing signal
(SYNC_BASE, SYNC_COM)
Synchronizing
possibilities
Sync signals for
BASE- and
COM BOARD
Aotewell Ltd
www.aotewell.com
Industry Automation
HongKong|UK|China
+86-755-8660-6182