SENKO kamini
–
Uputstvo za upotrebu
1
Chimney connection executed by the company
:
Company/Business: ____________ Person in charge: ________________
Street: ________________________ City: _______________________
Telephone: ____________________ Country: _____________________
Date: ________________ Client signature: _________________________
Chimney Smoke venting pipe (
if connected
)
Type: ………………. Cross-section (mm): …………
Dimensions (mm): …………………. Length (m): ……………
Height
(m): ……………………….. Number of elbows: ……….....
Draught
(Pa): ………….
Flue gases exit temperature
(°C): …………
Last inspection date
: ………………
Number of connections
: ……………….
Central heating system connection executed by the company
:
Company/Business: ____________ Person in charge: ________________
Street: ________________________ City: _______________________
Telephone: ____________________ Country: _____________________
Date: ________________ Client signature: ________________________
BILJEŠKE
:
INSTALLATION REPORT
COMPLETED BY THE CENTRAL HEATING INSTALLATION CONTRACTOR
stamp and signature
stamp and signature
Open system yes no
Closed system yes no
Connection execute in accordance with DIN 4751 yes no
Heated space volume (m
3
): …………
Expansion tank volume (m
3
): …………
Pump type: …………….. Water flow (m
3
/h): ……………
Safety valve type: …………….. Safety valve approved at …….bar
Water temperature (°C)
inlet: ……….
outlet: ..........
81
COMPLETED BY THE CHIMNEY-SWEEPER
Summary of Contents for P 10 WATER+AIR Slim Modern
Page 1: ...INSTRUCTION MANUAL SN EN 719 PELLET STOVES SLIM MODERN P 8 AIR 8 kW P 10 WATER AIR 12 kW...
Page 14: ...SENKO pellet SLIM MODERN stoves Instruction manual 13 Figure 1a P 8 AIR SLIM MODERN...
Page 15: ...SENKO pellet SLIM MODERN stoves Instruction manual 14 P 10 WATER AIR SLIM MODERN Figure 1b...
Page 71: ...SENKO pellet SLIM MODERN stoves Instruction manual 70 Figure 43 a b c d e f g h...