Step 19 — Install the Y Tower
Install the final tower. This is the Y tower. It will install the same as the previous two towers, with
the exception that this tower has no wires installed so you will not have to worry about pinching
any wires.
After you have installed this tower, tighten fully.
All towers have now been installed.
Assembling Artemis 300
© 2018
seemecnc.dozuki.com/
Page 17 of 40