Step 16 — Installing the X Tower
The X Tower will be the first tower to be installed. This tower is the one with the extruder and whip
pre-installed. To begin, you will want to elevate the printer's upper assembly so it is up higher than
the length of the rail. For our assembly we used the box that the upper assembly came in, or a
workbench height table.
If you have not done so at this point, you'll want to make sure you remove the 1/4-20 x 1" long
button head screws, split ring washer, and flat washer from the end of the tower for the following
steps. The same goes for all other towers as you get to them.
Ensure that the end-stop legs are bent over at a 45 degree angle as shown in the picture. Check
at all 3 tower locations in the upper assembly.
You will want to grasp all the wires that are exiting the top of the X tower and push the bundle
down in the relief that is cut into the T-Slot. Pushing down on the wires will help create a little
memory in the wiring.
You will now want to feed the bundle of wires in through the opening in the side of the sheet metal
enclosure.
Continued on next step...
Assembling Artemis 300
© 2018
seemecnc.dozuki.com/
Page 14 of 40