Step 18 — Installing the Z Tower
You will now install the Z tower,
similarly to how you installed the X
tower. The Z tower is the one in
which you previously ran wires
down. Start by making sure the end-
stop legs are folded over.
Begin by measuring the length of the
wires that exit the Z tower. You will
want to have 1 foot of wire exiting
the tower at the bottom. Make the
adjustment of the wires now.
As you did before, grasp all the
wires at the top of the tower (the end
with the stepper motor) fold them
into the relief in the T-Slot and hold
to give them some memory.
Feed the wires into the opening in
the side of the upper assembly. This
is the opening that is the opposite of
the name badge (front of the
printer).
Slide the tower into the opening as
you did with the X tower.
Make sure to look from the outside
of the tower towards the center of
the upper assembly and ensure that
the wires are ALL in their relief.
Attach the tower to the upper
assembly using 2 each of the
provided 1/4-20 x 1" long button
head screws, split ring washer, and
flat washer. Fully Tighten.
Assembling Artemis 300
© 2018
seemecnc.dozuki.com/
Page 16 of 40