Step 50 — Perform Initial Power Up and Function Test
At this time we will wait to install the two covers. We will perform the initial power up and check
functions before buttoning up. For the sake of continuity though, we have included the installation
of the covers in this guide. So, read about it now so you can install it later, or came back later for
the correct installation procedure.
Plug in the power cable to printer.
Turn the printer on.
The hot end should light up, as well as the status LEDs on the Duet board.
We will now move on to the initial connection and setup. NOTE: We will install the base & top
cover when complete.
Go Here Next >
Assembling Artemis 300
© 2018
seemecnc.dozuki.com/
Page 38 of 40