Step 13 — Preparing to Install Towers
We will now begin to prepare the top of the machine to install the towers.
There is a fan installed on the cover. Current machines have this connector already installed. If not,
it will need a connector installed on the leads. You will use a 2 pin KK connector. Install the red
wire in PIN 1 and the black wire in PIN 2.
You can now set the cover aside.
Step 14 — Identification of Tower Locations
This image of the Upper Assembly
will assist you in identifying the X Y
& Z tower locations for correct
installation.
Assembling Artemis 300
© 2018
seemecnc.dozuki.com/
Page 12 of 40