Step 30 — Ground and Neutral Connectors
The ground (green) and neutral (white) wires go to their respective locations on the power supply.
Unscrew the clamps and reinstall with the ring terminals in place as shown.
Step 31 — Brown Wire Connection
The brown wire exiting the Z tower with NO connector on it will install in the only empty clamp on
the relay.
You may need to strip a little extra of the sheathing off this wire.
Unscrew the clamp on the relay just enough to insert the wire.
Insert the wire as close to the center of the clamp where the screw is as possible, then tighten the
screw to clamp the metal plate down on the wire.
Make sure not to tighten the screw too much!
You're now done with the top wire connections!
Assembling Artemis 300
© 2018
seemecnc.dozuki.com/
Page 25 of 40