CW-6S INDIRECT COOLER INSTALLATION MANUAL | 31
APPENDICES
DESCRIPTION
DATE
DRAWING SCALE
DRAFTER
ENGINEER
MANAGER
DRAWING TITLE
CLIENT
PROJECT
DATE
DRAWING NUMBER
REV
DO NOT SCALE FROM THIS DRAWING
ISSUE
PROJECT NUMBER
SHEET SIZE
INITIAL
REVISION
Consulting Engineers
452 Pulteney Street, Adelaide SA 5000
Telephone (08) 8231 2832 Facsimile (08) 8311 1742
www.mlei.com.au
TALENTED | APPROACHABLE | RESPONSIVE | PIONEERING
NOT FOR CONSTRUCTION
ISSUED FOR CERTIFICATION
GENERAL NOTES 2
NTS
S02
A3
C8
2017-6648
JT
TH
Apr-19
GENERIC AIR CONDITIONING ROOF MOUNT
SEELEY INTERNATIONAL
PG
THE SAFETY RISK MITIGATION ITEMS BELOW ARE BASED ON MLEI'S DESIGN OFFICE EXPERIENCE AND DO NOT NECESSARILY ACCOUNT FOR ALL CONSTRUCTION, OPERATION, MAINTENANCE AND DEMOLITION SAFETY RISKS BASED ON INFORMATION WHEN THIS DRAWING WAS MADE IN ITS CAPACITY AS DESIGNER ONLY. MLEI HAS TRIED TO IDENTIFY SAFETY RISKS PERTAINING TO CONSTRUCTION, OPERATION, MAINTENANCE AND DEMOLITION PHASES OF THE ASSET. INCLUSION (OR NOT) OF ANY ITEM DOES NOT REDUCE OR LIMIT OBLIGATIONS OF CONSTRUCTOR, USER, MAINTAINER AND DEMOLISHER TO UNDERTAKE APPROPRIATE RISK MANAGEMENT ACTIVITIES TO REDUCE RISK AND IS NOT AN ADMISSION BY MLEI THAT INCLUSION OF ANY ITEM IS THE DESIGNER'S RESPONSIBILITY.
SID3
CONSTRUCT BUILDING ELEMENTS THAT CONTRIBUTE TO SAFETY SUCH AS HAND RAILS AND TOE BOARDS, FALL ARREST SYSTEMS, etc. AS EARLY AS POSSIBLE.
SID4
PROVIDE SAFETY BARRIERS AT EDGES OF OPENINGS AND ELEVATED AREAS.
SID5
REVIEW ADEQUACY OF WORKING SPACE AVAILABLE FOR CONSTRUCTION ACTIVITIES. ENSURE SEPERATION OF PLANT AND PERSONNEL ON SITE, INCLUDING MOVEMENTS OF BOTH.
SID6
LOCATE LIFTING SLEW AND LAY DOWN AREAS AWAY FROM REGULAR CONSTRUCTION TRAFFIC.
SID7
ENSURE ISOLATION SAFE SYSTEMS OF WORK OR PROTECTIVE MEASURES ARE INSTALLED BEFORE WORKING NEAR LIVE ELECTRICAL INFRASTRUCTURE. PROVIDE PROTECTION OF ELECTRICAL OVERHEAD WIRING SYSTEMS DURING CONSTRUCTION.
SID8
PROVIDE ACCESS AND EGRESS TO EXCAVATIONS APPROPRIATE IN CASE AND INUNDATION, COLLAPSE OF ENGULFMENT.
SID9
LOCATE STOCKPILES AND HEAVY EQUIPMENT INCLUDING CRANES AWAY FROM BURIED SERVICES AND BUILDING BOUNDARIES WHERE ADJACENT BASEMENTS ARE PRESENT.
SID10
SEEK ADVICE FROM SUITABLY QUALIFIED GEOTECHNICAL OR STRUCTURAL ENGINEER PRIOR TO OPERATION OF HEAVY SURFACE PLANT AND EQUIPMENT OR STOCKPILING MATERIAL NEAR OPEN EXCAVATIONS OR EXISTING RETAINING STRUCTURES.
SID11
DO NOT STOCKPILE MATERIALS BEHIND OR EXCAVATE IN FRONT OF EXISTING RETAINING WALLS UNTIL WALL STABILITY HAS BEEN REVIEWED BY SUITABLY QUALIFIED STRUCTURAL ENGINEER.
SID12
HAVE LOAD CAPACITY OF STRUCTURES VERIFIED BY SUITABLY QUALIFIED STRUCTURAL ENGINEER BEFORE LOADING OF STRONG MATERIALS ON EXISTING OR PARTIALLY COMPLETED STRUCTURAL ELEMENTS.
SID13
SEEK ADVICE FROM SUITABLY QUALIFIED STRUCTURAL ENGINEER IF PLANNING CRANE LIFTS OR HOIST INSTALLATION OF PARTIALLY ERECTED OR SUSPENDED STRUCTURES.
SID14
HAVE SUITABLY QUALIFIED STRUCTURAL ENGINEER UNDERTAKE STRUCTURAL CHECK OF EXISTING CONCRETE, MASONRY AND STUD WALLS WHERE FIXINGS OR EQUIPMENT IS TO BE ATTACHED.
SID15
INSTRUCT SERVICES CONTRACTORS UNDER NO CIRCUMSTANCES CAN STRUCTURAL MEMBERS BE CUT, NOTCHED OR DRILLED TO ACCOMMODATE NEW SERVICES.
SID16
DO NOT CUT OR UNBOLT ANY STRUCTURAL MEMBERS WITHOUT SEEKING REVIEW BY SUITABLY QUALIFIED STRUCTURAL ENGINEER.
SID17
PROVIDE BUCKLING STABILITY TO LONG SPAN BEAMS, TRUSSES etc DURING ERECTION. IF UNSURE CHECK WITH SUITABLY QUALIFIED STRUCTURAL ENGINEER PRIOR TO LIFTING AND INSTALLATION.
SID18
MINIMIZE SITE BASED TREATMENTS (eg WELDING, CUTTING, SPRAY PAINTING, GRIT BLASTING, etc.). PROVIDE ADEQUATE PROTECTION, SCREENING AND VENTILATION TO MINIMIZE HAZARDS TO PERSONNEL IF SITE BASED TREATMENT IS UNAVOIDABLE.
SID19
TRY TO AVOID WORKING IN CONFINED SPACES. IF CONFINED SPACES WORK CAN'T BE AVOIDED, PROVIDE A SAFE WORK METHOD STATEMENT ADDRESSING MITIGATION OF RISKS. PROVIDE ADEQUATE SIGNAGE TO TEMPORARY AND PERMANENT CONFINED SPACES TO AS2865.
SID20
AVOID HOT WORKS ON SITE, PARTICULARLY IN TIMBER FRAMED STRUCTURES. HOT WORKS TO COMPLY WITH CLIENT PROCEDURES FOR APPLICATION "HOT WORKS PERMITS".
SID21
DETERMINE APPROPRIATE METHOD OF PAINT REMOVAL AND DISPOSAL BEFORE STRIPPING PAINT, PARTICULARLY ON HISTORIC STRUCTURES COATINGS CONTAINING COAL TAR EPOXIES, BITUMENS AND ASPHALTS, ZINC CHROMATE AND LEAD PRESENT A HEALTH RISK. PROVIDE SCREENING TO PUBLIC AND ENVIRONMENT FOR PAINT REMOVAL AND CLEANING OPERATIONS. USE ENVIRONMENTALLY APPROPRIATE RESTORATION METHODS DURING MAINTENANCE AND REPAIR WORK.
SID22
MAKE WORK AREAS SAFE WHERE STRUCTURAL ELEMENTS ARE DAMAGED, CRACKED OR HAVE SUFFERED SIGNIFICANT SECTION LOSS BEFORE ALLOWING GENERAL CONSTRUCTION OR REPAIR ACCESS.
SID23
REPORT SIGNIFICANT SECTION LOSS OR CORROSION FLAKING BEFORE STARTING PAINTING OR REPAIRS. CONSULT SUITABLY QUALIFIED STRUCTURAL ENGINEER IF SECTION LOSS OR EXTENSIVE CORROSION FLAKING PRESENT BEFORE PROCEEDING WITH WORK.
SID24
DEVELOP AND IMPLEMENT RISK MITIGATION STRATEGIES BEFORE ALLOWING ACCESS OVER SUSPENDED CLADDING FINISHES THAT MAY BECOME BRITTLE OVER TIME.
SID25
REPORT LOOSE OR MISSING BOLTS etc. IN CONNECTIONS ENCOUNTERED DURING DAY TO DAY OPERATIONS.
SID26
REMOVE MATERIAL FROM STORAGE STRUCTURES BEFORE UNDERTAKING MAINTENANCE WORKS.
SAFETY IN DESIGN NOTES
THIS DRAWING IS OWNED BY, AND REMAINS THE PROPERTY OF MLEI CONSULTING ENGINEERS . REPRODUCTION OR USE OF THIS DRAWING WITHOUT PERMISSION IS ILLEGAL.THE CLIENT IS LICENSED TO USE THIS DRAWING FOR THE WORKS SPECIFICATION THIS SITE.
SID2
THE DESIGN HAS NOT BEEN REVIEWED WITH CONTRACTOR/BUILDER AT THE TIME OF ISSUE FOR TENDER OR CONSTRUCTION. CONSTRUCTION METHODS VARY BETWEEN CONTRACTORS, SO IT IS NOT POSSIBLE FOR MLEI CONSULTING ENGINEERS TO PERFORM AN EXHAUSTIVE SAFETY IN DESIGN OR SAFETY IN CONSTRUCTION REVIEW. ONCE APPOINTED, THE CONTRACTOR IS REQUIRED TO UNDERTAKE A THOROUGH REVIEW OF THE DESIGN WITH THEIR SUBCONTRACTORS TO IDENTIFY SAFETY RISKS DURING CONSTRUCTION AND DURING THE LIFE OF THE BUILDING.
SID1
MLEI CONSULTING ENGINEERS HAVE CONDUCTED A PRELIMINARY SAFETY IN DESIGN REVIEW OF THE DESIGN ON THESE DRAWINGS. IT IS SUMMARIZED IN THE NOTES BELOW. THE REVIEW IS BASED GENERALLY ON THE PROCEDURE OUTLINED IN THE SAFE WORK AUSTRALIA PUBLICATION "SAFE DESIGN OF STRUCTURE CODE OF PRACTICE".
SID27
SID28
RECOMMENDED INSTRUCTIONS TO INSTALLER
I1
EXISTING TRUSSES & ROOF FRAMING TO BE INSPECTED THOROUGHLY BEFORE BEGINNING ANY WORKS.
I2
NOTE ANY NOTICEABLE DEFLECTION OR DETERIORATION OF EXISTING TRUSS OR ROOF MEMBERS.
I3
ONCE EXISTING FRAMING HAS BEEN DEEMED IN ADEQUATE CONDITION AND IS WITHIN THE REQUIREMENTS OF THIS GENERIC DESIGN, INSTALLATION MAY BEGIN.
I4
INSTALL AIR CONDITIONING UNIT AND ADDITIONAL STRUCTURE AS PER DESIGN.
I5
ANY PROPRIETARY PRODUCTS ARE TO BE INSTALLED STRICTLY IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATION.
I6
REFER TO SAFETY IN DESIGN NOTES FOR POTENTIAL RISKS AND MITIGATION TECHNIQUES
I7
IF INSTALLATION REQUIRES A WORKING PLATFORM, CONSULT ENGINEER AS NECESSARY.
I8
INSTALL ALL STRENGTHENING MEMBERS AND TRIMMERS BEFORE THE AIR CONDITIONING UNIT.
I9
ONCE INSTALLATION IS COMPLETE, ENSURE WORK SITE IS LEFT AS IT WAS FOUND.
I10
DROPPER TO BE IN ACCORDANCE WITH THOSE SPECIFIED IN MANUFACTURER INSTALLATION MANUAL - NOT DESIGNED/VERIFIED BY MLEI.
ISSUED FOR CERTIFICATION
C6
HN
27.2.19
ISSUED FOR CERTIFICATION
C7
HN
28.3.19
ISSUED FOR CERTIFICATION
C8
TN
05.04.19
APPENDIX – A GENERIC STRUCTURALLY