background image

R ACC S1500E v00 EN

Options & accessories

Open cooling towers
S1500E

INSTALLATION INSTRUCTIONS

Summary of Contents for S1500E

Page 1: ...R ACC S1500E v00 EN Options accessories Open cooling towers S1500E INSTALLATION INSTRUCTIONS...

Page 2: ...2 W W W B A L T I M O R E A I R C O I L E U Notes...

Page 3: ...fill pack 8 Internal service platform Internal ladder only 9 External ladder and railing on top of hot water basin 9 Ladder 10 Handrail 10 Discharge attenuation 10 Single discharge atttenuation 11 Dou...

Page 4: ...rized service and maintenance personnel At no time this equipment should be operated without all fan screens access panels and access doors in place When the equipment is operated with a variable fan...

Page 5: ...The bottom connection installation is typical for all bottom outlets equalizer and remote sump connections Bottom connection parts are shipped loose Internal sliding service platform The sliding plat...

Page 6: ...e installed brackets Handrail configuration depending on unit size Slide in the horizontal tubes into the vertical posts secure with hardware installed in vertical post Secure the vertical posts in ea...

Page 7: ...m to the fill side Remove the access ladder by removing the two M12 bolts Remove the M10 securing hardware on each side of the platform Remove the handrail and vertical posts Slide the platform to the...

Page 8: ...m full area only for S15E xxxx 11xE and S15E xxxx 12xE units Install bolts M10 Lift the ladder into place and drop the pre welded bolts into the mounting holes in the upper support channel No further...

Page 9: ...p of hot water basin The external service ladder cage and the handrail are shipped loose Unit with installed ladder and railing External ladder brackets are factory installed Lift the ladder and cage...

Page 10: ...tall all vertical posts Slide in handrails and tighten with set screws Handrail Tighten with M10 hardware Discharge attenuation Single discharge attenuation Lift single discharge attenuator onto the p...

Page 11: ...lign the 4 L brackets with pre installed plates Fasten with M10 hardware Intake attenuation Single stack unit Lift the intake attenuator onto the steel or concrete support structure The shipping strap...

Page 12: ...ator onto the lower intake attenuator Make sure the intake attenuator attachment holes line up with the unit holes Secure with tappers Secure with tappers The shipping strap diagonals can be removed a...

Page 13: ...nstall one bolt nut facing up on door side of the socket Fasten davit socket with M10 hardware to preinstalled brackets Attach the davit socket at each motor location Hook onto bottom flange of fan de...

Page 14: ...hipped loose fan cowl only on single stack units with WQ fan Lift a single fan cowl with fan guard onto the two factory installed fan cowls Each fan should have stack op 3 cowls on top of each other A...

Page 15: ...BaltimoreAircoil eu MORE INFORMATION REFERENCE LITERATURE Eurovent 9 5 6 Recommended Code of Practice to keep your Cooling System efficient and safe Eurovent Cecomaf 2002 30p Guide des Bonnes Pratique...

Page 16: ...S HYBRID PRODUCTS PARTS SERVICES www BaltimoreAircoil eu info BaltimoreAircoil eu www balticare com info balticare com Baltimore Aircoil Int nv Industriepark Zone A B 2220 Heist op den Berg Belgium Ba...

Reviews: