CW-6S INDIRECT COOLER INSTALLATION MANUAL | 15
PRELIMINARY CABLE INSTALLATION
Your installation kit includes a mains power cable and a control
cable. It also includes a Heat/Cool Duct Switch module which
requires a separate mains socket outlet. This outlet is best
located near the socket outlet supplying power to the installed
gas heater, as the Heat/Cool Duct Switch needs to be within 20
metres of the heater because of the communications cables.
For Australia Only
The control cable will be routed through the corner recess slot
in the transition (as shown below) by the installer.
This cable must be routed through this corner recess prior
to the cooler being mounted to the dropper.
ILL3116-A
ILL3029-A
INSTALLATION
Insert the four (4) T-Washers and push them down into the
transition piece as shown. The T-Washers should be facing
outwards and will be sitting inside the dropper.
MOUNTING THE DROPPER ASSEMBLY
ILL2782-A
ILL2783-A
FLASHING THE DROPPER
The dropper may now be flashed to the roof. Make sure there is
no chance of water entering the roof space.
IMPORTANT!
Each T-Washer has three (3) holes in it. Once
in position,
use each of the three holes in the T-Washers to
pre-drill three (3) pilot holes outwards through the dropper
that are 4mm in diameter. This must be completed before
lifting commences.
DO NOT DRILL ANY OF THE PROVIDED 12g TEK SCREWS
INTO THE DROPPER AT THIS STAGE – THESE ARE FOR
USE LATER IN THE INSTALLATION.
Pass the non-taped end of the control cable up into the dropper
duct, through the grommet. Pull the cable through and position
it in the transition slot where the sticker markers are. Leave
excess length of the cables (1.5m or 60” each) hanging out of
the roof dropper and not inside the dropper.
The socket end of the mains power cable must also be
installed. This is located (and restrained) within the tank of
the cooler. Pass the power socket end of the mains cable
through the rear access hole (RHS) in the tank and then pull
the remainder of unrestrained mains cable through such that it
protrudes out of the underside of the tank.
If installing manually, the mains power cable must be
installed BEFORE the cooler is secured to the dropper
Refer to appendix C (Steps 15-16). If installing by crane,
a section of the power cable must be routed through the
corner recess slot of the dropper transition whilst the
cooler is suspended above the dropper (Refer Step 8 of
installation)
.
To assist this process, bunch the loose power cable up and tape
it to an exterior panel on the side of the cooler for easy access
during installation. Do this whilst the cooler is on the ground.
Refer appendix C, steps 2 to 6.