CW-6S INDIRECT COOLER INSTALLATION MANUAL | 17
CRANE INSTALLATION
Important! Two people are required to guide the cooler
onto the dropper.
Lifting the Cooler
1. Prepare the cooler for lifting as per the ‘Lifting the Cooler’
section.
2. Ensure that the transition has been secured to the dropper
as per the ‘Preparing the Dropper & Transition’ section.
3. Ensure that the dropper is mounted as per the ‘Mounting
the Dropper’ section.
4.
IMPORTANT!
Ensure that the control cable has been
installed as per the ‘Preliminary Cable Installation’ section.
5. Carefully lift the cooler to the dropper location.
Marrying the cooler and transition
6.
Important!
Position the cooler above the dropper and
stabilize. Carefully lower the cooler very slowly until it
sits approximately 100mm (4”) above the transition. Stop
lowering the cooler at this point.
7. Check the orientation of the cooler to make sure it is in the
correct position. As shown, the branding on the front of the
cooler should be positioned toward the front of the dropper.
8. When the cooler is suspended slightly above the dropper,
remove the tape restraining the power cable and allow it
to dangle loosely. Using the height template tool, guide
the mains power cable into the corner recess slot on the
transition and down into the dropper.
CAUTION: Avoid
placing hands and body parts underneath the cooler
whilst it is suspended.
Once this is complete, check to
make sure that the white dropper transition straps are
visible (as shown). These straps are flared outwards and
should be protruding out from the tank as shown. The
(black) foam packaging/sling guides beneath the tank have
been designed to guide the (white) transition straps into
their positions outside the dropper without fouling on the
transition.
ILL3028-A
ILL3030-A
ILL3036-B
INSTALLATION
3. Place the slings underneath the cooler and through the
dedicated recess channel in the foam supporting blocks
as shown. Rocking, lifting &/or blocking up the front of the
cooler will be required to pass slings beneath cooler while
it sits on the pallet. Consider using parts of the packaging
to aid with this process. Care must be taken not to damage
cooler tank. Ensure appropriately rated slings are used.
The slings must also comply with Australian (or local)
Standards. Suggested sling length is 6m (19’ 7”). Once
properly slung and fastened, the cooler is ready for lifting.
Suitability of the lifting method is the riggers responsibility.
ILL2785-A
DO NOT LIFT USING ANY CABINET FEATURES,
ALTERNATE SLING LOCATIONS OR BY RETRO-FITTING
LIFTING LUGS.
The cabinet may be damaged and/or lift safety may be
compromised.
DO NOT ATTEMPT TO LIFT THE COOLER WITHOUT THE
FOAM SUPPORTING BLOCKS.
The foam supporting blocks are essential for lifting. If they are
missing or damaged, contact the dealer and/or resort to the
‘piece-by-piece’ method of installation.
DO NOT ATTEMPT TO LIFT THE COOLER ON THE PALLET.
It is not possible to install the cooler via crane if the pallet is
used to sling the cooler.
ILL3027-A