Final QA
At the end of the installation a final quality assurance check is required
Cables are cable tied and do not interfere with
the function of the vehicle
Cables are hidden from view as much as possible
No rubbish is left in the vehicle from the
installation
All your tools have been removed
All vehicle pieces and bolts are placed back on
the vehicle
All components of the guardian gen2-2 has been
installed
All photos have been taken (detailed in the
installation checklist)
The system powers down when the key is off
(detailed in the installation checklist)
You have completed the installation checklist
You have called 24/7 support to activate the
vehicle(detailed in the installation checklist)
You have notified the site manager the truck is
ready for release and they have signed off the
checklist (detailed in the installation checklist)
Paperwork has been uploaded to supports email
of vehicle connection(detailed in the installation
checklist)
INSTALLATION IS NOW COMPLETE!!!
INSTALLATION IS NOW COMPLETE
Summary of Contents for Guardian Gen 2
Page 1: ...FIELD SUPPORT MANUAL Guardian Generation 2 Gen2 ...
Page 7: ...FIELD SUPPORT MANUAL Section 1 Introduction to Guardian Gen 2 2 ...
Page 32: ......
Page 35: ...T ...
Page 53: ...4 2 COMPONENT INTERCONNECTIONS ...
Page 77: ...4 5 SUMMARY OF INSTALLATION PROCESS o ...
Page 83: ......
Page 84: ...Table of Contents 3 4 6 9 10 11 12 ...
Page 85: ......
Page 86: ...2 1 PREVENTATIVE MAINTENANCE ...
Page 87: ......
Page 88: ...3 1 Self Checks during boot up ...
Page 89: ... 3 2 System Test Mode ...
Page 90: ... ...
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ...7 1 Blackbox Overview ...
Page 95: ...7 2 Copying Blackbox Data from the unit ...
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ...7 3 Delivering Blackbox Data to 24 7 Support ...
Page 101: ......