SANY LATIN AMERICA
8-46
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
8.12 Swing Motor and Swing Drive AS - Remove and Install
8.12.1 Removal
1
3
4
2
5
6
7
ZXT225-1106002
8
9
ZXT225-1106003
1. Disconnect the hoses (1) to (7).
●
Between hydraulic tank and swing motor
(port DR)
●
Between central swivel joint and swing mo-
tor (port DR)
●
Between swing motor and main valve (port
M)
●
Between swing motor and main valve (port
HA)
●
Between swing motor and main valve (port
HB)
●
Between swing motor and main valve Px
port (port SH)
●
Between swing motor and solenoid valve
block (port PG)
2. Remove the 11
fi
xing bolts (8).
3. Lift the swing motor and swing drive as-
sembly (9) for disassembling.
NOTE: Slowly lift the swing motor and
swing drive assembly in order to avoid
damaging the hoses and other parts.
Swing motor and swing drive as-
sembly: 260 kg
Release the residual pressure in the hy-
draulic circuit. Refer to “Residual Pressure
in Hydraulic Circuit - Release” on page 6-40.
CAUTION
●
L o w e r t h e w o r k e q u i p m e n t t o t h e
ground. Stop the engine. Press the re-
lease button of the breather valve to re-
lease residual pressure in the hydraulic
tank. Place the hydraulic lockout con-
trol in the LOCK position.
https://www.tractormanualpdf.info/