SANY LATIN AMERICA
8-38
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
4. No. 1 planetary carrier assembly
1) Remove the No.1 planetary carrier as-
sembly (3).
2) Disassembly of No.1 planetary carrier
assembly.
3) Remove the screws (4). Remove the
coverplate (5) from the planetary carrier
assembly (6).
4) Remove the thrust washer (7), gear (8),
bearing (9), bearing inner race (10) and
a second thrust washer (11).
5. No.1 sun gear shaft
Remove No.1 sun gear shaft (12).
3
ZX215-1006056
9
7
4
5
10
8
11
6
ZX215-1006057
12
ZX215-1006058
https://www.tractormanualpdf.info/