SANY LATIN AMERICA
8-39
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
8. Disassembly of No.2 planetary carrier
assembly
1) Remove the screws (15). Remove the
plate (16) and the planetary gear (17)
from the carrier assembly (22).
2) Remove the bearing inner race (19)
and outer race (18). Remove the plate
(20).
3) Remove the screw (21) to take the
planetary carrier assembly (22) and the
shim (23) from the body.
6. Thrust washer
Remove the thrust washer (13).
7. No.2 sun gear
Remove No.2 sun gear (14).
9. Hub assembly
1) Use eyebolts to remove the hub as-
sembly (24) from the travel motor.
13
14
ZX215-1006059
17
20
21
22
18
19
15
16
23
ZX215-1006060
②
24
ZX215-1006061
https://www.tractormanualpdf.info/