Coordinate
Offset
Stake-Out
X/ E
△
△
: X coo
between stake-o
the present m
p int.
△
△
rdinate offset
ut point and
easurement
o
Y/ N
:
Y coordinate offset
out point and
sent measurement
【
Alignment S-O
】
3/3
▲
PtID
:
C100+0.0
R.Ht
:
2.000 m
△
Y/E
:
89.212 m
/N
△
X
:
92.369 m
△
H
:
---.--- m
Ⅰ
A
between stake-
the pre
point.
ll DIST RECORD
↓
P
ong the three stake-
take-Out for example to introduce the OPERATIONAL STEPS of
a
For more inform
t, please refer
t
O
(Take points on the central line for example.)
OPERATIONAL STEPS
OPERATION
DISPLAY
ress [PAGE] to switch am
Here, take Polar S
lignment stake-out in detail.
o “5.6 STAKE OUT”.
PERATIONAL STEPS
:
out mode.
ation about other methods of stake-ou
【
Road
①
Set job, station and
orientation first, then in Road
menu, press [F4] to enter into
Road function.
s
】
[ * ] F1 Setting Job (1)
n (2)
n (3)
(4)
[F4]
[ * ] F2 Setting Statio
[ * ] F3 Set Orientatio
F4 Start
②
Define horizontal alignment
and vertical alignment (as
required to compute fill/dig).
Pres
Road program.
F1 Define HZ Alignment
F2 Define VT Alignment
【
Roads
】
s [F3] to start Stake Out
F3 Stake Out Roads
③
stak
chai
between side chainage point
and central line. Height
distance is required if fill/dig
data s to be staked out.
Offs_L
:
Horzontal distance
between the left chainage point
and central line.
Offs_R
:
Horzontal distance
between the right chainage
-O
】
Displays the alignment
【
Alignment S
StartC
:
Incre.
:
1.000
100.000 m
m
:
1.000 m
Offs_R
:
2.000 m
1.000 m
m
e-out data. Input start
nage, chainage increment,
Offs_L
and the horizontal distance
i
HtDi.L
:
HtDi.R
:
1.000
OK
149
Summary of Contents for STS-750
Page 6: ...6...