⑥
Display result of Tie Distance.
△
:
The horizontal distance
betwenn Point A and Point B.
△
:
The slope distance
between Point A and Point B.
△
:
The vertical distance
between Point A and Point B.
Slope: The slope between Point
Point 1
:
1
:
2
:
-49.6%
△
【
Tie Result
】
1/2
▼
Point 2
Grade
A and Point B (%).
:
0.663 m
△
:
0.741 m
△
:
-
0.329 m
Pt1 Pt2 RADIAL
Azimuth
:
the azimuth between
Point A and Point B.
【
Tie Result
】
2/2
▼
Point 1
:
1
⑦
Press [PAGE] to turn to Page
2.
PAGE
Point 2
:
2
AZ
:
173°12
′
53
″
PT1 PT2 RADIAL
Softkeys – polygonal method:
[F1]([NewPt1]): An additional missing line is computed. Program starts again (at point 1).
[F2]([New Pt2]): Point 2 is set as starting point of a new missing line. New point (Pt2) must be
measured.
[F4]([RADIAL])
:
Switch to radial method.
5.9.2 Radial (A-B, A-C)
OPERATIONAL STEPS
:
OPERATIONAL STEPS
OPERATION
DISPLAY
107
Summary of Contents for STS-750
Page 6: ...6...