om arc.
wise directio
in two diment
the arc.
to stake out
fset’measurement
t of reference arc
a: stake-out point
c: stake-out chord
al angle
5
ining Reference Arc
OPERATIONAL STEPS
:
OPERATIONAL STEPS
OPERATION
DISPLAY
Odd: Perpendicular distance
All arc are difined in clock
All calculations are made
Procedure
:
1. Define
fr
n.
ions.
2. Decide to measure or
1)
:
’Line & Of
2)
:
Stake ou
b: stake-out arc
d: stake-out centr
.12.2.1 Def
①
In Programs menu, press
AGE] to turn to Page 2.
hen press [F4] to start
ut.
[P
T
Reference Line/Arc
Stake-O
PAGE
[F4]
(5)
F2 Stake Out (6)
F3 Free Station (7)
F4 COGO (8)
【
Programs
】
1/3
▼
F1 Surveying
【
Programs
】
2/3
)
F2 Area(Plan) (6)
F1 Tie Distance (5
F3 Remote Height (7)
F4 Reference Line/Arc (8)
②
Set job, station and
e
Reference
Line/Arc Stake-Out function.
(As the method of setting
job, station and orientation
have been introduced
previously, it will not be
repeated here.).
【
Reference Line/Arc
】
]F2 Setting Station (2)
[ * ]F3 Set Orientation (3)
F4 Start (4)
ori ntation, and press [F4]to
enter into
[ * ]F1 Setting Job (1)
[ *
123
Summary of Contents for STS-750
Page 6: ...6...