
36
SALICRU
8.5. INSTALLATION OF PARALLEL OPERATION SYSTEM
The system can have three UPS cabinets in parallel, which can
extend to a capacity of total 900KVA.
Two UPS cabinets are connected as is shown in Fig. 55.
UPS1
UPS2
Load Connected
Output Power Supply
Power Supply
Fig. 55.
Parallel diagram
The parallel board is located at the back of the UPS cabinet,
whose name is PS1203-TF4 as is shown in Fig. 56.
Zoom A AREA
Parallel board
PS1203-TF4
Fig. 56.
Location of the Parallel board