25
4.3 Cleaning procedure
Before cleaning the machine, the operator has to prepare the machine for the cleaning process and
follow the sequence below exactly.
a. Start machine and stop after 2 seconds.
b. Remove all objects lying on top of the machine. Open tool box.
c. Remove box from underneath produkt discharge.
d. Open cutting area door completly and remove discharge funnel.
e. Remove fastening slider from the processing shaft.
f. Remove the sectioning blade.
g. Place cutting blade in a safe storage area.
h. Remove the Multi-cutter and dismantle it.
i. Put the main switch of the machine to ”0”.
k. Remove plunger plate by sliding it out of the processing shaft towards the top.
l. Use drinking water from a water hose or a pressure cleaner to hose down the machine and the
dismantled attachments, which have to be in a secured position, in the temperature range from
50 – 60 °C (according to the softening point of fat).
m.
Put the cleaning agent solution into a pressure foam generator at 3 bar, hose the foam onto
the machine and the attachments and wait for 15 minutes.
n.
Use drinking water from a water hose or a pressure cleaner to hose down the machine and
the dismantled attachments in the temperature range from 50 – 60 °C followed by drying
with compressed air which is suitable for food (according to DIN ISO 85731-1).
o. Remove the processing shaft and the fastening slider from the machine
p. Remove the plunger plate by sliding it out of the processing shaft towards the
top.
q. Pull the pre-compacting plunger away from the machine and dismantle the
attachments.
A
B
C
Summary of Contents for SR1 turbo
Page 5: ...5...