4-51
4
1
2
4
4-13 CARRIAGE WIRE TENSION ADJUSTMENT (Referential Time : 10min.)
3
Adjust the tension with the ADJUSTMENT SCREW so
that it will be as 13lb ~ 15lb when replacing the wire, or
9lb ~ 11lb in other cases.
Measure the wire tension with the TENSION METER
(ST-011) at the center of the LM GUIDE.
Loosen the screws shown in the figure.
Remove the I/S COVER,LEFT COVER,FRONT
COVER and FRONT RAIL COVER.
FRONT COVER
FRONT RAIL COVER
LEFT COVER
I/S COVER
Summary of Contents for VersaCamm SP-540V
Page 31: ...2 10 2 3 SERVO BOARD ...
Page 32: ...2 11 ...
Page 37: ...2 16 2 4 HEATER BOARD ...
Page 40: ...2 19 2 5 SUB BOARD ...
Page 88: ...3 43 9 Carry out the LINEAR ENCODER SETUP ...
Page 150: ...4 53 4 9 Check and make sure that the tension is within the range If not adjust it again ...