3-1
3 Replacement of Main Parts
The necessary adjustments after the replacement of each part, and the referential time for each work are
described as follows.
*1 Input the serial number in the [SERVICE MENU] > [SERIAL NO.].
*2 It can be performed in the [SERVICE MENU] > [CAP&WIPER CHECK].
*3 It can be performed in the [SERVICE MENU] > [FORCE ADJUST].
*4 It can be performed in the [SERVICE MENU] > [KEY CHECK].
*5 It can be performed in the [SERVICE MENU] > [SENSOR CHECK].
*6 It can be performed in the [SERVICE MENU] > [FAN CHECK].
*7 It can be performed in the [SERVICE MENU] > [PUMP CHECK].
*8 It can be performed in the [SERVICE MENU] > [HEATER CHECK].
*9 It can be performed in the [SERVICE MENU] > [CAP ADJUST] >
[CHECK GAP].
SERVO BOARD REPLACEMENT : 12min.
1. SENSOR CHECK *5
1. THERMISTER CHECK
(INK CARTRIDGE SENSOR, INK EMPTY SENSOR and
2. HEAD ALIGNMENT
PINCH ROLLER SENSOR)
3. HEAD INFORMATION CLEAR
2. CAP & WIPER CHECK *2
4. CAP HEIGHT CHECK *9
3. FAN CHECK *6
5. TOOL / CROP MARK POSITION ADJUSTMENT Adj. Time : 57 min
4. PUMP CHECK *7
< Total Time : 77min. >
5. AGING
6. TOOL PRESSURE ADJUSTMENT
TOOL CARRIAGE REPLACEMENT : 15 min
7. CROP MARK SENSOR ADJUSTMENT
1. LIMIT & CUT DOWN POSITION ADJUSTMENT
8. TOOL / CROP MARK POSITION ADJUSTMENT
2. TOOL HEIGHT ADJUSTMENT
9. PRINT / CUT POSITION ADJUSTMENT Adj. Time : 40min.
3. TOOL PRESSURE ADJUSTMENT
< Total Time : 52min. >
4. CROP MARK SENSOR ADJUSTMENT
5. TOOL / CROP MARK POSITION ADJUSTMENT
6. PRINT/CUT POSITION ADJUSTMENT Adj. Time : 52 min
HEATER POWER BOARD REPLACEMENT : 10min.
< Total Time : 67min. >
1. HEATER CHECK *8 Adj. Time : 3min.
< Total Time : 13min. >
CAP TOP REPLACEMENT : 10 min. (2pcs.)
1. CAP HEIGHT CHECK *9 Adj. Time : 2min.
HEATER CONTROL BOARD REPLACEMENT : 5min.
< Total Time : 12min. >
1. HEATER CHECK *8 Adj. Time : 3min.
< Total Time : 8min. >
CARRIAGE MOTOR REPLACEMENT : 20 min
1. SERVO LOCK CHECK
JUNCTION BOARD 1 REPLACEMENT : 10min.
2. AGING
1. SENSOR CHECK *5
3. MOTOR HOURS CLEAR Adj. Time : 5min.
(HEAD LOCK SENSOR, LIMIT SENSOR, FRONT COVER SENSOR,
< Total Time : 25min. >
MAINTENANCE COVER SENSOR, SHEET LOAD SENSOR,
FRONT PAPER SENSOR, REAR PAPER SENSOR)
PUMP REPLACEMENT : 15 min.
2. CAP & WIPER CHECK *2
1. PUMP TIMES CLEAR
3. FAN CHECK *6
< Total Time : 15min. >
4. SCAN MOTOR AGING Adj. Time : 8min.
< Total Time : 18min. >
MAIN BOARD REPLACEMENT : 12 min.
1. DIP SW SETTING
JUNCTION BOARD 2 REPLACEMENT : 5min.
2. BATTERY INSTALLATION
1. SENSOR CHECK *5
3. FIRMWARE INSTALLATION
(SHEET LOAD SENSOR, INK CARTRIDGE SENSOR, EMPTY SENSOR)
4. SYSTEM PARAMETER INITIALIZE
2. FEED MOTOR AGING Adj. Time : 3min.
5. HEAD RANK SETTING
< Total Time : 8min. >
6. SERIAL NUMBER INPUT *1
7. CAP & WIPER CHECK *2
NETWORK BOARD REPLACEMENT : 9min.
8. CAP HEIGHT ADJUSTMENT
1. FIRMWARE UPGRADE
9. SENSOR CHECK
2. IP ADDRESS SETTING Adj. Time : 7min.
10. LIMIT & CUT DOWN POSITION INITIALIZE
< Total Time : 16min. >
11. LINEAR ENCODER SETUP
12. TOOL PRESSURE ADJUSTMENT
CARRIAGE WIRE REPLACEMENT : 45min.
13. INK TYPE SETTING
1. WIRE TENSION ADJUSTMENT
14. HEAD ALIGNMENT
2. LIMIT & CUT DOWN POSITION INITIALIZE
15. CALIBRATION 3.
LINEAR
ENCODER
SETUP
16. CROP MARK SENSOR ADJUSTMENT
4. CUTTING QUALITY CHECK Adj. Time : 18min.
17. TOOL / CROP MARK POSITION ADJUSTMENT
< Total Time : 63min. >
18. PRINT / CUT POSITION ADJUSTMENT Adj. Time : 90min.
< Total Time : 102min. >
LINEAR ENCODER REPLACEMENT : 25min.
1. LINEAR ENCODER SETUP Adj. Time : 3min.
CUTTING CARRIAGE BOARD REPLACEMENT : 7min.
< Total Time : 28min. >
1. TOOL UP/DOWN CHECK *3
2. PINCH ROLLER SENSOR CHECK
LINEAR SCALE REPLACEMENT : 20min.
3. CROP MARK SENSOR ADJUSTMENT
1. LINEAR ENCODER SETUP Adj. Time : 3min.
4. TOOL / CROP MARK POSITION ADJUSTMENT
< Total Time : 23min. >
5. PRINT / CUT POSITION ADJUSTMENT Adj. Time : 26min.
< Total Time : 33min. >
CROP MARK SENSOR REPLACEMENT : 10min.
1. CROP MARK SENSOR ADJUSTMENT
CARRIAGE BOARD REPLACEMENT : 15min.
2. TOOL / CROP MARK POSITION ADJUSTMENT
1. THERMISTER CHECK
3. PRINT / CUT POSITION ADJUSTMENT Adj. Time : 25min.
2. LINEAR ENCODER SETUP Adj. Time : 10min.
< Total Time : 35min. >
<Total Time : 25min.>
BATTERY REPLACEMENT : 7min.
PANEL BOARD REPLACEMENT : 7min.
1. BATTERY FLAG CLEAR
1. LCD/LED//BUZ CHECK
< Total Time : 7min. >
2. KEY CHECK *4 Adj. Time : 3min.
< Total Time : 10min. >
HEAD REPLACEMENT :
20min. (1 Head)
Summary of Contents for VersaCamm SP-540V
Page 31: ...2 10 2 3 SERVO BOARD ...
Page 32: ...2 11 ...
Page 37: ...2 16 2 4 HEATER BOARD ...
Page 40: ...2 19 2 5 SUB BOARD ...
Page 88: ...3 43 9 Carry out the LINEAR ENCODER SETUP ...
Page 150: ...4 53 4 9 Check and make sure that the tension is within the range If not adjust it again ...