Installation
Check-out and Power-up
108
MagneMotion
Rockwell Automation Publication MMI-UM013B-EN-P - April 2020
Node Controller Power-up
Node controllers can be powered up and tested without being connected to the transport sys-
tem. Once the node controller has been installed, check all connections and perform an initial
power-up. This section describes the procedure for the initial installation check-out.
1.
Make sure that all installation procedures that are described in this chapter have been
completed.
2.
Make sure that the node controller is properly grounded.
3.
Connect the node controller to the main power disconnect. Make sure that power
remains off.
4.
Perform a Ground Continuity check from the surfaces of the node controller to a
known good ground.
5.
Apply power to the node controller.
The indicators on the node controllers light as shown in
.
6.
If power-up was successful, the node controller is ready to accept commands. How-
ever, if the power-up sequence was unsuccessful, see
.
7.
For new installations, set the node controller IP addresses and specify the node con-
troller to be used as the high-level controller (see
).
CAUTION
High-Voltage Hazard
110V AC @ 0.7 A (25 W max).
The AC circuit must be properly protected.
Table 5-2: Startup Indicators
Component
Indicator
Status
Node Controller, NC-S
Power
On
Node Controller, NC-E
(Power)
On
Node Controller, NC-12
Power
On
Node Controller, NC LITE
None
—