Rockwell Automation Publication 20P-TG003B-EN-P - September 2021
53
Access Procedures
Chapter 3
8.
Remove the two stand-offs and washers from the control board.
9.
Install one screw in the lower left corner of the control circuit board.
Install the I/O Expansion Circuit Board
Install the I/O expansion board in reverse order of removal.
Remove two stand-offs and washers
Tightening torque for re-assembly is
1.0 N
•
m (8.9 lb
•
in)
Install screw
Tightening torque for re-assembly is
1.0 N
•
m (8.9 lb
•
in)