4
• Glucose Control Testing
66
Applying the control solution
Once the meter has checked the test strip, the hourglass
icon disappears and you are prompted to apply control
solution.
1
Wait until the flashing drop appears in the display
before applying the control solution. The meter
beeps.
2
Apply a drop of glucose control solution to the
front edge
of the test strip. Do
not
apply the con-
trol solution to the top of the strip.
The control solution is pulled into the test strip by
capillary action.
Once sufficient control solution has been detected, the
meter beeps and the measurement begins.
Control Test
Control L2 (Hi) 123456
Strip Lot 545794
12:48 pm
09/18/13
When applying the control solution, position the meter
so that the test strip port is always higher or on the
same level as the control solution. This prevents any
excess solution from flowing down the strip and
entering the meter.
Summary of Contents for ACCU-CHEK Inform II
Page 1: ...Accu Chek Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ...0 4807839001 05 2013 09 EN Operator s Manual Version 5 0 A ACCU CCU CHEK HEK Inform II System ...
Page 6: ...6 This page intentionally left blank ...
Page 12: ...12 This page intentionally left blank ...
Page 104: ...8 Proficiency Testing 104 This page intentionally left blank ...
Page 160: ...12 General Product Information 160 This page intentionally left blank ...
Page 206: ...D Supplement for Observed Test Sequence 206 This page intentionally left blank ...
Page 210: ...Index 210 This page intentionally left blank ...
Page 211: ...211 ...