
13
Linking
2. Remove the two link hooks on the top panel. Do not remove these
hooks for the unit that will be the rightmost unit as seen from the
front.
Put the screws and hooks in a box or other suitable container, to
make sure that you do not lose any parts. The parts will be required
later for reassembly.
3. For the leftmost unit as seen from the front, roll up the link cable
around the connector and push it into the empty space in the unit.
PICKUP
VIBRA
TION METER UNI
T
RMS
EQ PEAK
EQ P-P
UV
-1
5
PICKUP
VIBRA
TION METER UNI
T
RMS
EQ PEAK
EQ P-P
UV
-1
5
PICKUP
VIBRA
TION METER UNI
T
RMS
EQ PEAK
EQ P-P
UV
-1
5
PICKUP
VIBRA
TION METER UNI
T
RMS
EQ PEAK
EQ P-P
UV
-1
5
Do not remove hooks
and fastening screws
of rightmost unit
Remove link hooks and fastening screws
on other units
3M
J3490-3
For leftmost unit as seen from
the front, roll up link cable
along with connector and tag,
and push into gap
Summary of Contents for UV-15
Page 2: ......
Page 10: ...viii...