![Rinnai EHP-HS004MR32-EX2 User'S And Installer'S Manual Download Page 15](http://html1.mh-extra.com/html/rinnai/ehp-hs004mr32-ex2/ehp-hs004mr32-ex2_users-and-installers-manual_1462691015.webp)
15
SScchheedduullee
SCHEDULE menu contents as follows:
1) TIMER for daily programming.
2) WEEKLY SCHEDULE for weekly programming.
3) SCHEDULE CHECK to check programming
4) CANCEL TIMER to cancel programming
TTIIM
MEERR
If weekly schedule is ON and the TIMER function is OFF, the setting
that is activated takes precedence over the setting that is not.
If the Timer is activated,
is displayed on home page.
Press LLEEFFTT ,, RRIIGGHHTT,, DDoowwnn,, U
UPP to scroll and press DDoowwnn,, U
UPP
to
adjust the
time, the mode and the temperature.
Movre to
█
, press '' OK '' to select or unselect .( the timer is
selected.
the timer is unselected.)
Six timers can be set.
If you want to cancel the TIMER, you move the cursor to ,press
“
OK
”,
the become
,the timer is invalid.
If you set the start time later than the end time or the
temperature out of range of the mode, the following page will
appear.
Example:
Six timer is set as following:
The unit will run as following:
Timer1 is useless.
Please check the timer setting and
temperature setting.
NO.
START
END
MODE
TEMP
1
1:00
3:00
DHW
50°C
2
7:00
9:00
HEAT
28°C
3
11:30
13:30
COOL
20°C
4
14:30
16:30
HEAT
28°C
5
15:00
19.00
COOL
20°C
6
18:00
23:30
DHW
50°C
2
2
4
4
6
2
4
2
4
6
SSTTAARRTT--U
UPP
SSyysstteem
m cchhaarrggee hheeaattiinngg//ccoooolliinngg
1 Switch ON the unit
2 From the keyboard put ON the domestic hot water mode and
wait until the lever of the 3 way valve goes to the right,
3 Switch OFF the unit
4 Press on the lever and move it to the centre until it locks
5 Start filling; open the filling tap located on the system
6 Open the flow and return taps located on the system
7 Open the vent valves of the terminals or radiators
8 Close them when water begins to exit; continue the charging
until the pressure intended for the system (max.3 bar).
9 Check the hydraulic seal of the joints.
•
Once the process is finished, the valve goes to heating/
cooling mode automatically when will be power on.
•
Repeat the operation after the unit has operated for a number
of hours and periodically control the system pressure.
Reintegration is carried out when the unit is off (pump OFF).
33--wwaayy vvaallvvee
SSyysstteem
m vveenntt
DDoom
meessttiicc hhoott wwaatteerr ttaannkk cchhaarrggee
Maximum DWH system pressure 6 bar
DWH saftey valve setting 6 bar
1 System general switch = OFF.
2 Close the drain valve
3 Start filling; open the DHW filling tap located on the system
4 Open the taps located on the system and connected to the
DHW outlet, DHW recirculation inlet and water inlet
5 Open the hot water taps (bathroom and kitchen)
6 Close the taps when water starts to come out.
7 Check the hydraulic seal of the joints.
AATTTTEENNTTIIO
ONN
During installation, use and maintenance operations, the motor
must NOT be removed.
In case of extraordinary maintenance see chapter MAINTENANCE
Rapid guide