GENERAL
9
16
15
20
23
11
24
12
6
1
15
26
25
15
7
6
14
12
13
17
1
2
3
4
9
10
11
8
5
6
7
1
18
14
8
9
20
3
4
5
10
22
21
19
17
14
3
27
INSIEME CONDENS 26 BK - 35 BK
SIDE VIEW
FRONT VIEW
TOP VIEW
1 - Control panel
2 - Side panel
3 - Automatic vent valve
4 - Automatic vent valve collector
5 - Boiler sensor sockets
6 - Fitting for CH circuit safety valve
7 - Fitting for CH circuit expansion vessel
8 - Flame inspection window
9 - Burner
10 - 120 litre insulated storage cylinder
11 - Storage cylinder drain cock
12 - Condensate drain siphon
13 - Socket for flue gas thermostat
14 - Insulated boiler body
15 - Insulated secondary heat exchanger
16 - Flue gas vent pipe
17 - Cover panel
18 - Front panel
19 - Boiler drain cock
20 - Lifting points
21 - Storage cylinder temperature sensor socket
22 - Storage cylinder flange
23 - CH circuit filling cock
24 - Magnesium anode
25 - Non-return valve
26 - Storage cylinder pump
27 - Flue fitting