INSTALLER
32
b
A check on the quality of combustion must be made
on initial start-up. Combustion quality can be affect-
ed by parameters other than the length, height and
position of the flue pipes.
b
All flue seals must be made from condensate (acid)
resistant materials.
r
INSIEME CONDENS
boilers can also be
installed in B23 open configurations using suit-
able piping in compliance with applicable laws and
standards.
r
INSIEME CONDENS
boilers derive their comburent
air from the room in which they are installed. Suitable air
vents must therefore be provided in compliance with
applicable laws and standards.
a
Never obstruct or restrict the air vents in the room
where the appliance is installed.