2.4.1 Cable Shield Grounding
Except for the power cord, all cables routed through the cord grips must be shield grounded against the enclosure.
• Use hardware provided in parts kit to install shielding clamps on the grounding bracket at the bottom of the enclosure.
• Install only the necessary amount of shielding clamps for the cord grips to be used.
• Remove the insulated jackets and shielding per the following instructions.
Shielding Procedure
1. Install the shielding clamps on the grounding rail using the clamp screws. Finger tighten the screws at this time.
2. Route the cables through the cord grips and the shielding clamps to determine the cable lengths required to reach the
appropriate cable connectors.
3. Mark cables to remove the insulated jacket as described below for Foil Shielded Cables and Braid Shielded Cables.
Foil Shielded Cables
Use the following procedure to shield ground foil shielded cables.
Figure 2-6. Foil Shielded Cable
1. Strip the insulated jacket and foil 1/2 in (15 mm) past the shielding clamp.
2. Strip another 1/2 in (15 mm) of the insulated jacket, leaving the foil shielding exposed.
3. Fold the foil shielding back on the cable where the cable passes through the clamp.
4. Ensure the silver (conductive) side of the foil is turned outward.
5. Wrap the shield wire around the cable, ensuring it contacts the foil where the cable passes through the clamp.
6. Torque shielding clamp screw to 10 in-lb (1.1 N-m), ensuring clamp is around the cable and contacting the shield wire.
Braid Shielded Cables
Use the following procedure to shield ground braid shielded cables.
Figure 2-7. Braid Shielded Cable
1. Strip the insulated jacket and braided shielding from a point just past the shielding clamp.
2. Strip another 1/2 in (15 mm) of the insulated jacket, leaving braid exposed where the cable passes through the clamp.
3. Torque shielding clamp screw to 10 in-lb (1.1 N-m), ensuring the clamp is contacting the braided shielding of the cable.
Length of foil before
folding back on
cable insulation
Silv
er
sid
e o
ut
Cut insulated jacket here
for foil shielded cables
Shield wire
Bra
id
Cut insulated
jacket here
Summary of Contents for REVOLUTION 682 Synergy Plus
Page 129: ......