27
Fie
ld C
on
ve
rsio
ns
ST-A1194-31-04
Notes:
Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW.
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL DRAIN PORTS ARE PLUGGED.
__ UNIT HAS FORWARD PITCH.
__ HEAT TAPE INSTALLED(IF REQUIRED).
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
Summary of Contents for 96MDV Series
Page 34: ...Field Conversions 34...
Page 35: ...Field Conversions 35...
Page 36: ...36 Field Conversions...
Page 37: ...37 Field Conversions...
Page 38: ...Field Conversions 38...
Page 115: ...115 TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS Diagnostics...
Page 120: ...120 Diagnostics TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS...
Page 126: ...126 FIGURE 65 2 STAGE ECM FURNACE WIRING DIAGRAM Troubleshooting...
Page 127: ...127...
Page 128: ...128 CM 1015...