Page 1
08/13
*2P0813*
507054-01
*P507054-01*
P.O. Box 799900, Dallas, TX 75379-9900
INSTALLATION INSTRUCTIONS
95AF2DFV
Warm Air Gas Furnaces
Upflow/Horizontal Left and Right Air Discharge
This is a safety alert symbol and should never be ignored. When you see this symbol on labels or in
manuals, be alert to the potential for personal injury or death.
This manual must be left with the homeowner for future reference.
CAUTION
As with any mechanical equipment, personal injury
can result from contact with sharp sheet metal
edges. Be careful when you handle this equipment.
WARNING
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, person
al injury or loss of life. Installation and service must
be performed by a licensed professional installer (or
equivalent), service agency or the gas supplier.
TABLE OF CONTENTS
Unit Dimensions
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Parts Arrangement
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
95AF2DFV Gas Furnace
4
. . . . . . . . . . . . . . . . . . . . . . . . .
Shipping and Packing List
4
. . . . . . . . . . . . . . . . . . . . . . . .
Safety Information
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Use of Furnace as a Construction Heater
5
. . . . . . . . . . .
General
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Combustion, Dilution & Ventilation Air
6
. . . . . . . . . . . . . .
Setting Equipment
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Filters
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Duct System
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pipe and Fitting Specifications
13
. . . . . . . . . . . . . . . . . . . .
Joint Cement Procedure
16
. . . . . . . . . . . . . . . . . . . . . . . . .
Venting Practices
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Gas Piping
34
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Electrical
36
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Integrated Control
40
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Unit Start-Up
41
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Gas Pressure Adjustment
42
. . . . . . . . . . . . . . . . . . . . . . . .
Proper Combustion
43
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
High Altitude
43
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Unit Adjustments
45
. . . . . . . . . . . . . . . . . . . . . . . . . .
Sequence of Operation
45
. . . . . . . . . . . . . . . . . . . . . . . . . .
Service
46
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Planned Service
48
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Repair Parts List
48
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Start Up and Performance Check list
49
. . . . . . . . . . . . . .
Supersedes 08/12