Fi
el
d
Co
nv
er
sio
ns
SEE CRITICAL HOSE CLAMP LOCATION NOTE
IN THE GENERAL COVERSION INSTRUCTIONS.
5
HOSE “D”
HOSE “E”
ROTATE
UNIT 90
5a - ROTATE UNIT 90°
5b - CUT 1/4" VENT HOSE TO FIT (APPROX. 6-1/2”) AND INSTALL AS SHOWN.
5c - CUT HOSE E AT LINE 1 - INSTALL
NOTE: MAKE SURE CUT IS STRAIGHT AND SQUARE
5d - CUT HOSE D (REMOVED IN STEP1) AT LINE 2 -INSTALL
5a
5b
5c
5d
NOTE:
USE SOAPY WATER TO FACILITATE EASY
HOSE AND TUBE ASSEMBLY
1/4” TUBE CUT
TO FIT (APPROX.
4”)
INSTALL
CUT
LINE 2
INSTALL
INSTALL
CUT LINE 1
NOTE: TO PREVENT DAMAGE TO THE TRAP, THE INSTALLER
MAY ELECT TO INSTALL IT DURING A LATER STEP. (AFTER
THE UNIT IS ROTATED)
4a - REMOVE METAL BRACKET AND.403" DRAIN PLUG - DISCARD.
4b - REMOVE HOSE “A” - DISCARD
4c - INSTALL Ø.559" CONDENSATE DRAIN PLUG
4d - CONDENSATE TRAP GASKET AS SHOWN
4e -
I
NSTALL CONDENSATE TRAP. MAKE SURE THE CHANNEL AT
THE LOCATION SHOWN IN THE “IMPORTANT SECTION”
ENGAGES THE EDGE OF THE JACKET AT THE LOCATION
SPECIFIED.
4f - SECURE USING 3 SCREWS.
4
(X3)
4e
INSTALL
CONDENSATE
TRAP GASKET
DISCARD
METAL BRACKET
AND
.403 DRAIN PLUG
DISCARD
HOSE “A”
4a
4b
4c
4d
INSTALL
.559 DRAIN
PLUG
THIS CHANNEL
MUST ENGAGE
JACKET AT THIS
EDGE TO AVOID
AIR LEAKS TO
THE BURNER
VESTIBULE!
!! IMPORTANT !!
CONDENSATE TRAP
INFORMATION
DRILL (3) Ø 1/8" HOLES
PRE-DRILL (3) Ø 1/8" HOLES AS SHOWN FOR CONDENSATE TRAP.
3
ST-A1194-35-01
NOTE: REMAINING STEPS SHOWN WITH FURNACE IN HORIZONTAL RIGHT ORIENTATION
40
Summary of Contents for 96MDV Series
Page 34: ...Field Conversions 34...
Page 35: ...Field Conversions 35...
Page 36: ...36 Field Conversions...
Page 37: ...37 Field Conversions...
Page 38: ...Field Conversions 38...
Page 115: ...115 TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS Diagnostics...
Page 120: ...120 Diagnostics TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS...
Page 126: ...126 FIGURE 65 2 STAGE ECM FURNACE WIRING DIAGRAM Troubleshooting...
Page 127: ...127...
Page 128: ...128 CM 1015...