RKF 130
Operating the piston filler
Version 1.1
Page 87 of 128
4.22
ROASTING AND ROTARY PISTONS
Installation of the correct parts in the correct sequence is a prerequisite for RKF
130 to function properly.
7
8
6
5
4
3
2
1
Figure 42: Installation sequence for roasting and rotary pistons