Route the YR motor cable
up towards the right Y
motor. Fold the excess
cable into the Panduit.
(Full X, Y, and Z cable
carriers have not yet been
installed as they are in the
diagram)
Route the E1 cable in a
similar manner to E2 and
X, bringing it up through
the initial Y axis cable
carrier on the corner plate
and along the runway
rail. Use the wiring clips
to hold it in place on the
runway rail.
You can also use some
twist ties to hold the wires
in the Panduits.
gigabot
®
: unassembled
200