n25
n26
n27
On top of the X/Y Upright
should be 4 links for the
Y axis cable carrier. Take
note of its orientation.
Use the 2mm Allen Key to
remove the M3x25 BHCS
and remove the links.
Open up the doors to the
links.
Pull the wires out from the
exit of the X axis cable
carrier to remove the
slack. Maintain the same
arrange of all the cables.