n4
n5
n6
Divide the remaining X
cable carrier bundle into
increments of approximately
6 to 8 links. Do not divide
up the Y cable carriers yet,
or you risk accidentally
mixing them together and
accidentally changing the
number of total links in either
the X or Y cable carriers.
On one section of cable
carrier links, open all of
the doors as shown. Use a
small flathead screwdriver
if needed.
Insert the trolley wires into
this section of links as shown,
starting with the E1 and E2
cables on top, then the head
cable and thermocouple wires
below that. Exact arrangement
apart from this does not matter,
as long as the wires do not
get tangled or overlap each
other—keep them as parallel
as possible while installing
cable carriers.
gigabot
®
: unassembled
234
Summary of Contents for Gigabot
Page 1: ...Bed Frame Bed Plate Installation...
Page 26: ...F D Y Motor Z Limit Switch Installation...
Page 36: ...Wiring Y Supports Electrical Box...
Page 51: ...Wiring Preliminary Routing...
Page 64: ...Wiring Connect Components Cover Panduits...
Page 74: ...Wiring Trolley Wiring...