n28
n29
n30
Insert the wires in the links
in the same way it was done
on top of the trolley bracket
at step N2. You may have to
twist the wire bundle around
so that the motor cables
remain on the “closed” part
of the links, with the head
cable and thermocouple
against the doors.
Place the links on top of
the X/Y Upright again, but
do not fasten it yet. Check
the orientation of the links,
such that it is the same as
in step N25.
Place the X/Y Upright
cover on top of the Y cable
carrier links and use the 2
M3x25 BHCS to fasten it
to the X/Y Upright. This
conceals the transition of
the wires from X axis to Y
axis.
gigabot
®
: unassembled
242
Summary of Contents for Gigabot
Page 1: ...Bed Frame Bed Plate Installation...
Page 26: ...F D Y Motor Z Limit Switch Installation...
Page 36: ...Wiring Y Supports Electrical Box...
Page 51: ...Wiring Preliminary Routing...
Page 64: ...Wiring Connect Components Cover Panduits...
Page 74: ...Wiring Trolley Wiring...