gigabot
®
: unassembled
206
Here, you will connect each cable to its corresponding component (except for those on the bridge
assembly, which will be done later). You will also connect the heated bed wires, which includes
fastening a green ground wire to the rear of the build plate.
In the previous section, wires were routed through the Panduits such as in the diagram above. Now,
the cables will be connected to their electronic components, managed within the Panduits, and then
covered. Note that the picture above also shows the Z cable carrier, which will be installed later.
overview
Summary of Contents for Gigabot
Page 1: ...Bed Frame Bed Plate Installation...
Page 26: ...F D Y Motor Z Limit Switch Installation...
Page 36: ...Wiring Y Supports Electrical Box...
Page 51: ...Wiring Preliminary Routing...
Page 64: ...Wiring Connect Components Cover Panduits...
Page 74: ...Wiring Trolley Wiring...