The precise horizontal direction the antenna is pointing in can be adjusted using the bolt with two
nuts (part No. 10 and 12). Once the direction has been set the antenna is fixed in place by tightening
the nuts against the bracket to prevent further movement of the antenna. The vertical direction the
antenna is pointing in can be adjusted by turning the fine adjustment bolt (part No. 9) by the
bracket mounting plate. After selecting the correct direction the position is secured by tightening
the bolt – see point d. (part No. 7 and 8). The correct position in both directions is found by monit-
oring RSS voltage, see Section 6.5.2, “Directing antennas”.
Fig. 6.18: Horizontal adjustment of the
antenna direction
Fig. 6.19: Vertical adjustment of the
antenna direction
g.
After pointing the antenna in the right direction tighten the bolts on the bracket on the axes of rotation
(part No. 6 and 11). Then check again that all other bolts have been sufficiently tightened. We can
now proceed to connect the FOD unit to the user network.
Fig. 6.20: Tightening the axis at the fine
adjustment bolt
Fig. 6.21: Tightening the axis at the bracket
RAy2 Microwave Link – © RACOM s.r.o.
48
Installation
Summary of Contents for Ray2
Page 2: ......
Page 6: ...6...
Page 64: ...7 3 Status Fig 7 6 Menu Status RAy2 Microwave Link RACOM s r o 64 Configuration...
Page 219: ...Appendix B Rain zone map 219 RACOM s r o RAy2 Microwave Link Rain zone map...
Page 234: ...234...