OPERATING INSTRUCTIONS
/ BEFORE STARTING TO TEST SAMPLES
56
MosaiQ 125 - User Manual - November 2020 - Reference n°: MMSURM.0010.02
7.1.2
PROCESSING SEQUENCE OVERVIEW
The table and diagram below provide an overview of the operation sequence from start
to finish.
Steps
Description
Prerun checks
• Check the
MosaiQ 125
external environmental conditions
(please refer to
chapter 18.6
of this manual)
Start-up
• Switch on the
MosaiQ 125
• Switch on the computer workstation
• Initialization
• Log in
• Maintenance
Before test run
Check available resources:
• Magazines
• Reagents
• System liquid
• Waste capacity
Removing and loading resources
• Magazines
භ
Remove empty (or expired) magazines
• Reagent bottles
භ
Remove empty (or expired) reagent bottles
• Load reagent bottles
• Load magazines
• Waste
භ
Empty solid waste container (waste bag)
භ
Empty liquid waste canisters
• System liquid
භ
Fill the water canister with purified water
Maintenance
• Execute required maintenance tasks
Quality control
• Run quality controls.
• Please refer to the appropriate IFU.
Steps
Description
Load samples and start test run
• Load sample tube racks
• Assign test order (only if no LIS connected)
• Start test run
Overview
• Switch to the
Overview
screen
Results
• View results
Remove and reload samples
• Remove finished sample tube racks
• Reload sample tube racks
Reload resources
• Reload resources
Notifications and special tasks
• Notifications
• Quality control tasks
• Maintenance tasks
At the end of the shift
• If
MosaiQ 125
is intended to be shut down for an extended
period (over 72 hours) remove all resources with exception
of water
Shut down
• Shut down the
MosaiQ Software
• Switch off the
MosaiQ 125
.