4
AS40 Conveyors | Installation & Maintenance Instructions
Installation
u
Check Your Shipment
Before opening the shipment, visually inspect the outside of the crate/box for shipping damage. Carefully unpack the crate/box, inspecting for component damage which
may have occurred inside the packing materials. Contact the carrier and QC Conveyors regarding any damage that may have occurred during shipment. Check the contents
of your shipment against the supplied packing slip and inform QC Conveyors of any discrepancies.
u
General Sequence of Installation
1
Mount conveyor to stands or
mounting brackets; install
angle brackets if appropriate. In
applications with three stands, install
angle braces only on outermost
stands.
2
Attach sides, guides or un-
derside idlers to conveyor and
adjust as needed.
3
Install drive motor and mount-
ing package.
4
Lag conveyor to floor/ Engage
caster locks and inspect
conveyor before use.
u
Assistance
If you need assistance, please contact QC Conveyors customer service department Monday through Friday, 8am-5pm EST at (513) 753-6000. In addition, your local dis-
tributor has been trained at the factory and can provide support in many ways. You can also visit our website - qcconveyors.com - for additional information and technical
documents.