AS40 Conveyors | Installation & Maintenance Instructions
11
Drive Packages
Conveyor may tip after motor is installed if feet are not properly lagged to floor if outriggers are not installed.
QC Conveyors recommends that all wiring be completed by a certified electrician to ensure correct installation. Refer to documentation contained in the motor’s box for
instructions on electrical connections.
u
Side Drive Mounting Package
The Drive Package will ship separate from the conveyor with the speed reducer attached, and the speed reducer’s coupler already attached to its shaft. For Standard Duty Drives
the speed reducer and motor will ship installed on the drive mounting package.
1
Remove and discard three cap
head screws from drive side
bearing block. (Leave bearing block
in place)
2
Install 4mm x 14mm key to
shaft. (Shipped with mount-
ing package)
3
Using a flathead screwdriver,
stake key. This will stop it
from sliding
4
Align pins to bearing plate
and slide mounting package
over pulley’s shaft against bearing
plate.
5
Insert three socket head cap
screws.
6
Tighten two socket head cap
screws.
7
The third socket head cap
screw will need to be tight-
ened at an angle through access
points using a ball head allen
wrench.
8
Ensure set screws on
couplings are tight. (Belt may
need to be rotated to reveal set
screws in window)