CONTENTS
Table of Contents
1 NOTICES..............................................................1
1.1 SAFETY.................................................................1
1.2 PRECAUTIONS.....................................................1
2 DESCRIPTION.....................................................2
2.1 INTRODUCTION...................................................2
2.2 MODELS AND FEATURES...................................2
2.3 STANDARD SUPPLIED ITEMS............................3
2.4 ACCESSORIES SOLD SEPARATELY.................3
2.5 DEFINITIONS AND CONVENTIONS....................3
3 SPECIFICATIONS................................................5
4 INSTALLATION....................................................7
4.1 GENERAL RULES.................................................7
4.2 MECHANICAL INSTALLATION.............................7
4.2.1 CONNECTIONS............................................7
4.3 CONNECTING THE LOAD CELL..........................8
4.4 POWER SUPPLY AND GROUNDING..................8
4.5 FIELD BUS CONNECTION...................................8
4.6 ENERGISING THE INSTRUMENT.......................8
4.7 RS-232C PORT CONNECTION............................9
4.8 CONFIGURING AND CALIBRATION....................9
4.8.1 PROGRAMMING..........................................9
4.8.2 CALIBRATION..............................................9
4.9 COMMISSIONING...............................................10
5 OPERATION.......................................................11
5.1 FRONT PANEL....................................................11
5.1.1 Connectors..................................................11
5.1.2 Status LEDs................................................11
5.1.2.1 Common LEDs...................................11
5.1.2.2 PT113EN............................................11
5.1.2.3 PT113PB............................................11
5.1.2.4 PT113PN............................................12
5.1.2.5 PT113EI.............................................12
5.1.2.6 PT113CO...........................................13
5.1.3 Programming Switch...................................14
6 SYSTEM CONFIGURATION AND SETUP.........15
6.1 INSTALLATION OF AZCOMT SOFTWARE........15
6.2 CONNECTION TO AZCOMT..............................16
6.3 SCALE BUILD, CALIBRATION AND GATEWAY17
6.3.1 Scale Parameter Setup...............................17
6.3.1.1 Increased External Resolution...........18
6.3.1.2 Digital Filter........................................18
6.3.1.3 Motion Detection................................18
6.3.1.4 Power On Zero...................................19
6.3.1.5 Zeroing Range...................................19
6.3.1.6 Auto Zero Tracking.............................19
6.3.1.7 Tare....................................................19
6.3.1.8 Save Tare at Power Off......................19
6.3.2 RS-232C Parameter Setup.........................19
6.3.2.1 RS-232C Data Format........................19
6.3.2.2 RS-232C Checksum..........................19
6.3.2.3 RS-232C Carriage Return..................20
6.3.2.4 RS-232C Line Feed...........................20
6.3.2.5 RS-232C Response Speed................20
6.3.2.6 RS-485 Setup (PT113MB only)..........20
6.3.3 Calibration...................................................20
6.3.3.1 Mode selection...................................20
6.3.3.2 Scale Build.........................................21
6.3.3.3 Scale Calibration................................21
6.3.3.3.1 Calibration with test weights...........21
6.3.3.3.2 Zero Adjustment..............................22
6.3.3.3.3 Span Adjustment.............................22
6.3.3.3.4 Span Adjustment under Load.........22
6.3.3.3.5 Change Capacity / Increment.........22
6.3.3.4 vCal Electronic Calibration.................22
6.3.3.4.1 vCal Wizard.....................................23
6.3.3.4.2 Improving accuracy with vCal.........23
6.3.4 Gateway......................................................24
6.3.4.1 PT113EN............................................24
6.3.4.2 PT113PB............................................26
6.3.4.3 PT113PN............................................26
6.3.4.4 PT113CO...........................................27
6.3.5 Back up Parameters and Calibration..........27
6.4 PRE-COMMISSIONING TESTING......................27
7 TROUBLE SHOOTING.......................................28
7.1 ERRORS.............................................................28
7.2 DIAGNOSTIC TESTS..........................................29
7.3 QUESTIONS AND ANSWERS............................30
7.4 ADDITIONAL RESOURCES...............................30
8 CONFORMITY....................................................31
9 APPENDIX..........................................................32
9.1 PT113MB, PT113EN - MODBUS........................32
9.1.1 Serial Data Output......................................32
9.1.1.1 RS-232C.............................................32
9.1.1.2 RS-485 (PT113MB only))...................32
9.1.1.3 Ethernet (PT113EN only))..................33
9.1.1.4 Continuous Data Formats..................33
9.1.1.5 BSI Communication...........................34
9.1.1.6 CHK Checksum..................................37
9.1.2 Modbus Protocol.........................................37
9.1.2.1 Modbus RTU Command Table..........38
9.1.2.2 CHK Checksum..................................40
9.1.2.3 Command Termination.......................40
9.2 PT113PB – PROFIBUS.......................................42
9.2.1.1 Programming and Calibration............42
9.2.1.2 Profibus Setup....................................42
9.2.1.3 PLC Setup (Profibus/Profinet)............45
9.3 PT113PN - PROFINET........................................46
9.3.1.1 Programming and Calibration............46
9.3.1.2 Profinet Setup....................................46
9.4 PT113EI - ETHERNET/IP....................................49
9.4.1.1 Programming and Calibration............49
9.4.1.2 Profinet Setup....................................49
9.4.1.3 PLC Setup (EtherNet/IP)....................50
9.5 PT113CO – CANOPEN.......................................56
9.5.1.1 EDS File.............................................56
9.5.1.2 CANopen Interface.............................56
9.5.1.3 CANopen Pinout................................60
Always check the PT web site for the most up to date information and revisions