52
>>
RECTANGULAR POOLS
>>
assemBly oF tHe metallIC stRuCtuRe
w
The metallic structure comprises posts joined together by flat bars at the top and
bottom (fig. 4). Observe how these parts overlap to ensure correct positioning of
the structure. The top links should be dismantled once the slab has been poured.
figure 4
w
After correctly positioning the first layer of rebar (fig 3), set out the metallic posts required
to assemble your pool (fig 8). Make sure that you fit them with jacks first (fig. 4). These posts
are joined together at the bottom with flat bars fastened by two screws (bag of screws A
and B fig. 4).
w
The distance between the each post is determined by the length of the flat bars.
w
The flat bars features 4 holes at each end.
w
The upper and lower connection bars are identical.
w
Around the base, the outer holes are used while the inner holes are used on bars
around the top of the structure. (fig 6).
figure 5