QUick OVerView
>> Excavation
>> Assembly of the metal structure
>> Pouring the concrete slab
>> The wooden structure
>> The filtration group
Tools :
(excluding concrete works and excavation)
a decameter,
a rope, tube wrench (13 and 17), a mallet,
a screw gun (with a torx, pozi bit), a stanley knife, a metal saw, a big spirit
level, a flat head screw driver, a cross head screw driver, bolt cutters, sand
paper, a file, excavation equipment.
Time required :
w
Excavation:
1 to 2 days (depending on the materials used)
w
Metallic structure
1 day (with 2 people)
w
Pouring the slab:
1 to 2 days (with 2 people and depending on the materials used)
w
Wooden structure and filtration :
2 to 3 days (with 2 people). The time indicated does not include the
concrete curing time.
w
Curing of the concrete slab before filling the pool with water : 2 to 3
weeks