
GB 04270 - Edition 02 -
March 12
1/4
C 404
Maintenance Menu
Setting of the maintenance follow-up
counters:
primary pump maintenance
secondary pump maintenance
filaments life time
cycles counter (hard vacuum test)
general detector counter (under
voltage, standby or test).
A message is automatically sent to the
operator when the set time is reached
to perform a maintenance.
Detector maintenance
D and E.
Purpose
Indicates the switching on hours number of the dedicated filament.
At each filament exchange, do a counter reset.
Filament 1-2
Cycles counter
s¬
Do not forget to do a counter reset after having done the mainte-
nance operation.
s¬
According to your need, you can set another value and so better
adapt the maintenance to your application.
Counter : when the set point is
reached, information message
display
Counter reset
% of cycles realized since the
latest counter reset
Counter balance
Counter reset
Counter balance
adixen Vacuum Products - ASM 380 Operating instructions
Summary of Contents for adixen ASM 380
Page 2: ......