4. Secure the Data COMM and strain gauge cables to the fork weldment lower and
upper push-mount cable ties: Secure the cables to the lower push-pin first and then
the upper push-pin cable tie.
a. Install new upper and lower right fork weldment push-mount cable ties (2x); one
next to the upper right fork weldment cable access hole and one next to the
lower right fork weldment cable access hole.
Contact Precor Customer Support at [email protected] or 800.786.8404 with
any questions.
Page 66
5 Replacement Procedures
Brake Caliper Assembly Replacement