![Precor SBK800-16 SPINNER Service Manual Download Page 104](http://html.mh-extra.com/html/precor/sbk800-16-spinner/sbk800-16-spinner_service-manual_1594855104.webp)
Note
: The zip tie that removed and used to hold the Mylar moisture barrier over the
LPCA board is not required to be replaced.
10. (Spinner® Chrono™ Power models only)
If the cross member cable ties were removed, replace them with new cable ties to
secure the generator, data COMM, strain gauge , and battery interface cables to the
cross member (4x locations).
11. Place the generator belt onto the generator and flywheel generator pulleys. Place the
belt onto the smaller generator pulley and walk the belt onto the larger flywheel gen-
erator pulley
12. Adjust the drive belt tension and tracking to specification, go to
and Tracking Adjustment" on page 27
Contact Precor Customer Support at [email protected] or 800.786.8404 with
any questions.
Page 96
5 Replacement Procedures
Drive Belt, Generator Belt, and Flywheel Replacement